Blog

Featured Editorial: Top considerations for emergency equipment specification, installation

BICBusiness and Industry Connection’s (BIC) August issue features an editorial by Casey Hayes, Director of Sales and Operations for Haws Integrated™, where he discusses the five factors to consider for emergency specification, installation.

Recommendations include details on:

  1. Equipment location
  2. Assuring visibility
  3. Product suitability
  4. Tempered water requirement
  5. Assuring proper maintenance

To read more from the Haws Integrated™ White Paper feature, you can visit BIC Magazine (page 73). Also, visit Haws Integrated™ for a full range of ANSI-compliant solutions!  haws integrated

And if you’re attending the National VPPPA Conference, come visit us at booth number 1010!

Haws Master Class: ANSI compliance for Shower and Eye Washes, October 2024

Get Free CEUs!

Join us on October 2nd 10-11am PST for our next ANSI Emergency Shower and Eye Wash Master Class!

Register NOW!